These three shots give a picture of what the floors look like before Doug begins laying the porcelain tile out onto the floor. The floor was covered with concrete board, a 1/4 inch thick concrete and plastic mesh. These pictures look a little bit as though newspaper was put on the floor, but, it is concrete board. The above picture is the dining room area, just below is a shot from the dining room into the kitchen.
This shot shows one of the kitchen doors which has been sanded repeatedly over the past three working days to try to get the stain off. This is quite a process! Door will be stained with a lighter color, on the inside, than on the outside.