This is a shot of the dining room area, also quite completely mudded. This was also done in about 3 days, as was the kitchen. The mud does not take very long to prepare (one part water, 5 parts "mud dirt") and it basically evens itself out over the floor.
Saturday, June 6, 2009
Subscribe to:
Post Comments (Atom)
1 comment:
I'm still waiting for a picture of mow...
Post a Comment